Brahmand NewsPrevious Article
Brahmand NewsNext Article
Headlines
  • Spanish Naval ship on Mumbai visit:-Spanish Navy ship 'Mendez Nunez' (Frigate) with a crew of 30 officers and 135 sailors is on Mumbai visit from May 18 to 23....
  • Indian Navy successfully test-fires MRSAM missile:-The Indian Navy has successfully test-fired a Medium Range Surface to Air Missile (MRSAM), achieving a significant milestone to enhance its anti-air warfare capability, the defence ministry said Friday. ...
  • India, Singapore conduct naval drill in South China Sea:-The navies of India and Singapore conducted their bilateral naval drill in the South China Sea on Sunday. Indian Navy ships Kolkata and Shakti took part in the bilateral naval exercise with Singapore, along with long range maritime patrol aircraft Poseidon-8I (P8I). The bilateral naval drill will be conducted till May 22....
  • Indian Navy Chief on farewell visit to Eastern Naval Command:-Chief of Naval Staff, Admiral Sunil Lanba is camping in Visakhapatnam for three days in what the Navy said is a farewell visit as he is set to retire from service on May 31....

HAL signs MoU with Central PWD for works at chopper factory

Line Spacing+- AFont Size+- Print This Article

BENGALURU (PTI): Defence public sector unit Hindustan Aeronautics Ltd has signed an MoU with Central Public Works Department for execution of the stage 2 infrastructure development works at its greenfield helicopter factory in Tumakuru at the Aero India here.

The MoU was signed by GVS Bhaskar, Chief Executive Officer, Helicopter Complex and Rajesh Jain, Chief Project Manager (CPM), HAL project zone, CPWD in the presence of R Madhavan, CMD, HAL, a release said on Friday.

HAL said the stage 2 works include development of infrastructure for structural assembly and equipping of helicopters at Tumakuru.

The project will be executed in a phased manner.

The new Helicopter factory is coming up on a 615 acres greenfield campus that would be fully self-sufficient for manufacturing full range of helicopters from 3 ton to 12 tons category.

According to HAL, the factory shall comprise facilities such as state-of-the-art manufacturing, structural assembly, final assembly-line facilities, heli-runway, aerodrome, and residential township for staff.

Tags:

Line Spacing+- AFont Size+- Print Article

Other Related News

Saab expands ties with Indian aerospace firms

Saab has taken an important step forward to expand its footprint and aerospace ecosystem in India by signing new MoUs with three of the country's aerospace manufacturers; Dynamatic Technologies Limited, CIM Tools Private Limited and Sansera Engineering Private Limited, the company said.

Upcoming Defence Exhibitions

BRAHMOS Missile Systems

Headlines

Brahmand World Defence Update 2019

Image Gallery