Brahmand NewsPrevious Article
Brahmand NewsNext Article

ISRO conducts ground testing of solid booster stage for SSLV


BENGALURU (PTI):  The ground testing of the newly-developed solid booster stage (SS1) for the new launch vehicle of ISRO -- Small Satellite Launch Vehicle (SSLV) -- was carried out on Monday at Satish Dhawan Space Centre in Andhra Pradesh's Sriharikota.

All the propulsion parameters during the test are found satisfactory and closely matching with the predictions, the Bengaluru-headquartered ISRO said in a statement.

SS1 motor is a three-segmented solid propulsion stage incorporating many new technologies and innovative processes that includes bond-free joint between the segments, high-power electro mechanical actuator with digital control electronics, optimised ignitor and simultaneous propellant casting of all segments, which have been successfully validated in the ground test, according to ISRO.

"The successful test of solid booster stage has given sufficient confidence to proceed with the first developmental flight of SSLV (SSLV-D1) which is scheduled in May 2022. The remaining stages of SSLV -- SS2 & SS3 stages -- have successfully undergone necessary ground tests and are ready for integration," the statement said.

Other Related News

India-born researcher led NASA's sounding rockets mission during solar eclipse

The US space agency on April 8 launched three sounding rockets during the solar eclipse – visible in North America – to study how Earth's upper atmosphere is affected when sunlight momentarily dims over a portion of the planet.

BRAHMOS Missile Systems

Headlines

Brahmand World Defence Update 2023

Brahmand World Defence Update

Image Gallery